Installation [10/2014 - 05/2019]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
Torque: 3.0 N.m (31 kgf/cm, 27 in.lbf)
- Install the No. 2 ECM bracket to the ECM with the 2 screws.
- INSTALL NO. 1 ECM BRACKET
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
Torque: 3.0 N.m (31 kgf/cm, 27 in.lbf)
- Install the No. 1 ECM bracket to the ECM with the 2 screws.
- INSTALL ECM
- Install the ECM with the 3 bolts.
Torque: 6.5 N.m (66 kgf/cm, 58 in.lbf)
NOTE:Replace with a new part if it is dropped or if it receives a strong impact.
- Connect the 2 ECM connectors and lock with the 2 levers.NOTE:
- When connecting a connector, make sure that dirt, water and other foreign matter is not stuck between the connector and ECM.
- Make sure that the 2 levers are securely lowered.
- Install the ECM with the 3 bolts.
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
- Insert the pin of the air cleaner case sub-assembly to the grommet of the engine mounting insulator LH.
*a Pin *b Grommet - Install the air cleaner case sub-assembly with the 2 bolts.
Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf)
- Attach the 3 wire harness clamps to connect the wire harness to the air cleaner case assembly.
- Insert the pin of the air cleaner case sub-assembly to the grommet of the engine mounting insulator LH.
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
- Install the air cleaner filter element sub-assembly.
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
- Attach the 2 clips to install the air cleaner cap sub-assembly.
- Tighten the hose clamp to secure the air cleaner cap sub-assembly.
- Attach the wire harness clamp to connect the wire harness to the air cleaner cap sub-assembly.
- Connect the intake mass air flow meter sub-assembly connector.
- INSTALL BATTERY
Refer to PROCEDURE - Step 5 [10/2014 - 05/2018] , or refer to PROCEDURE - Step 5 [05/2018 - 05/2019]
- INSTALL BATTERY INSULATOR
Refer to PROCEDURE - Step 6 [10/2014 - 05/2018] , or refer to PROCEDURE - Step 6 [05/2018 - 05/2019]
- INSTALL BATTERY CLAMP SUB-ASSEMBLY
Refer to PROCEDURE - Step 7 [10/2014 - 05/2018] , or refer to PROCEDURE - Step 7 [05/2018 - 05/2019]
- CONNECT CABLE TO POSITIVE BATTERY TERMINAL
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2014 - 09/2017] , or refer to INITIALIZATION [09/2017 - 05/2019]
- PERFORM INITIALIZATION
Refer to INITIALIZATION [10/2014 - 09/2017] , or refer to INITIALIZATION [09/2017 - 05/2019]