Installation [09/2014 - 03/2019]: Procedure
- INSTALL BRACKET
- Install the bracket to the instrument panel safety pad sub-assembly with the 2 screws.
- INSTALL ROLL RATE AND VERTICAL ACCELERATION SENSOR
- Install the roll rate and vertical acceleration sensor with the 2 nuts.
Torque: 9.0 N.m (92 kgf/cm, 80 in.lbf)
NOTE:- Do not drop the roll rate and vertical acceleration sensor.
- If the roll rate and vertical acceleration sensor is dropped, replace it with a new one.
- Connect the connector to the roll rate and vertical acceleration sensor.NOTE:
Make sure that the roll rate and vertical acceleration sensor connector is connected securely.
- Engage the 2 wire harness clamps to the bracket.NOTE:
Do not twist the wire harness when installing it.
- Install the roll rate and vertical acceleration sensor with the 2 nuts.
- INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to INSTALLATION [09/2014 - 11/2017] , or refer to INSTALLATION [11/2017 - 03/2019]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [09/2014 - 08/2016] , or refer to INITIALIZATION [08/2016 - 11/2017] , or refer to INITIALIZATION [11/2017 - 03/2019]
- PERFORM YAW RATE AND ACCELERATION SENSOR AND ROLL RATE AND VERTICAL ACCELERATION SENSOR ZERO POINT CALIBRATION
Refer to CALIBRATION [09/2014 - 11/2017] , or refer to CALIBRATION [11/2017 - 03/2019]