Installation [09/2014 - ]: Procedure
- INSTALL INJECTOR DRIVER NOTE:
- Be careful not to drop or strike the injector driver.
- The injector driver is grounded at the 4 bolts and 2 nuts. To ensure that it is grounded, clean the installation surfaces of the injector driver and engine before installing the injector driver.
- Temporarily install the 2 injector drivers with the 4 bolts and 2 nuts.
- Tighten the 4 bolts and 2 nuts.
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- Connect the 2 injector driver connectors.
*a Lock Lever - Connect the 6 connectors (with lock) to the 2 injector drivers and move the lock lever to engage the lock of each connector (with lock) as shown in the illustration.NOTE:
Securely connect the connectors (with lock) to the injector driver and engage the lock.
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 96 [09/2014 - 05/2018] , or refer to PROCEDURE - Step 97 [05/2018 - 03/2019] , or refer to PROCEDURE - Step 96 [03/2019 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [09/2014 - 08/2016] , or refer to INITIALIZATION [08/2016 - 11/2017] , or refer to INITIALIZATION [11/2017 - 03/2019] , or refer to INITIALIZATION [03/2019 - 01/2023] , or refer to INITIALIZATION [01/2023 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]