LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2021 >> RC F Fuji Speedway Edition >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control System - Service Information >> PCV Valve >> Installation [09/2014 - ] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [09/2014 - ]: Procedure

  1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY) 
    1. Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

      Adhesive

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    2. Using a 22 mm ball joint lock nut wrench, install the PCV valve (ventilation valve sub-assembly) to the case separator.

      Specified tightening torque 

      Torque: 5.0 N.m (51 kgf/cm, 44 in.lbf) 

      NOTE:

      Do not start the engine for at least 1 hour after installation.

      GTY512135Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [09/2014 - 11/2017] , or refer to PRECAUTION [11/2017 - ]

      • When using a 22 mm ball joint lock nut wrench (fulcrum length of 151 mm (5.94 in.)) + torque wrench (fulcrum length of 185 mm (7.28 in.)):

        3.0 N.m (31 kgf/cm, 27 in.lbf)

    3. Connect the ventilation hose assembly to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
  2. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 11

  3. INSTALL INTAKE AIR SURGE TANK ASSEMBLY 

    Refer to INSTALLATION [09/2014 - ]