Installation [09/2015 - ]: Procedure
- INSTALL NO. 2 ECM BRACKET
- Install the No. 2 ECM bracket to the ECM with the 2 bolts.
Torque: 3.0 N*m (31 kgf*cm, 27 in.*lbf)
- Install the No. 2 ECM bracket to the ECM with the 2 bolts.
- INSTALL NO. 1 ECM BRACKET
- Install the No. 1 ECM bracket to the ECM with the 2 bolts.
Torque: 3.0 N*m (31 kgf*cm, 27 in.*lbf)
- Install the No. 1 ECM bracket to the ECM with the 2 bolts.
- INSTALL ECM
- Install the ECM with the 2 bolts and nut.
Bolt
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
Nut
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
NOTE:If the ECM has been struck or dropped, replace it.
- Engage the wire harness clamp.
- Connect the 2 ECM connectors and lower the 2 levers.NOTE:
- When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water or other foreign matter.
- Be sure to securely connect the ECM connectors.
- Install the ECM with the 2 bolts and nut.
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 4 [09/2015 - 08/2016] , or refer to PROCEDURE - Step 4 [08/2016 - 08/2019] , or refer to PROCEDURE - Step 4 [08/2019 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [09/2015 - 08/2016] , or refer to INITIALIZATION [08/2016 - 12/2017] , or refer to INITIALIZATION [12/2017 - 08/2019] , or refer to INITIALIZATION [08/2019 - ]
- PERFORM INITIALIZATION
Refer to PRECAUTION [09/2015 - 08/2016] , or refer to PRECAUTION [08/2016 - 08/2019] , or refer to PRECAUTION [08/2019 - ]