Installation [12/2021 - ]: Procedure
- INSTALL NO. 1 ECM BRACKET
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- INSTALL NO. 2 ECM BRACKET
Torque: 4.5 N.m (46 kgf/cm, 40 in.lbf)
- INSTALL ECM
- INSTALL AIR CLEANER ASSEMBLY LH WITH AIR CLEANER HOSE ASSEMBLY LH
Refer to PROCEDURE - Step 2
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to INSTALLATION [12/2021 - ]
- WRITE VIN
w/ Canister Pump Module: Refer to REGISTRATION [12/2021 - ]
w/o Canister Pump Module: Refer to REGISTRATION [12/2021 - ]
HINT:
It requires when replacing the ECM.
- ECU CONFIGURATION
Refer to ECU CONFIGURATION [12/2021 - ]
HINT:
It requires when replacing the ECM.
- UPDATE ECU SECURITY KEY
Refer to UPDATE ECU SECURITY KEY [12/2021 - ]
HINT:
It requires when replacing the ECM.
- WORK PROCEDURE AFTER PARTS INSTALLED
Refer to WORK PROCEDURE [12/2021 - ]
- WORK PROCEDURE AFTER BATTERY RECONNECTED
Refer to BEFORE DISCONNECTING BATTERY [12/2021 - ]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.