LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2022 >> NX 250 AWD >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Control System - Service Information >> Camshaft Oil Control Valve >> Installation [11/2021 - 03/2022] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [11/2021 - 03/2022]: Procedure

  1. INSTALL CAMSHAFT TIMING VALVE ASSEMBLY 
    1. GTY1076353Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      1. Temporarily install the camshaft timing valve assembly to the camshaft timing exhaust gear assembly.
        NOTE:
        • If the camshaft timing valve assembly has been struck or dropped, replace it.
        • Make sure to fit the protrusion of the camshaft timing valve assembly into the cutout of the camshaft timing exhaust gear assembly.
      2. Using a 5 mm hexagon socket wrench, install the camshaft timing valve assembly with the bolt.

        Torque: 19 N.m (194 kgf/cm, 14 ft.lbf) 

      3. Pull the camshaft timing valve assembly to confirm that is installed securely.
  2. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY 

    Refer to INSTALLATION [11/2021 - ]