Installation [12/2017 - ]: Procedure
- INSTALL MASS AIR FLOW METER SUB-ASSEMBLY
HINT:
Perform "Inspection After Repair" after replacing the mass air flow meter sub-assembly.
Refer to INITIALIZATION [12/2017 - 10/2020] , or refer to INITIALIZATION [10/2020 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]
- Install the 2 mass air flow meter sub-assemblies with the 4 screws.NOTE:
- If the mass air flow meter sub-assembly has been struck or dropped, replace it.
- If reusing the mass air flow meter sub-assembly, be sure to inspect the O-ring.
- Make sure that the O-ring is not cracked or does not move out of place during installation.
- Connect the 2 mass air flow meter sub-assembly connectors.
- Install the 2 mass air flow meter sub-assemblies with the 4 screws.
- INSTALL LOWER RADIATOR AIR DEFLECTOR
Refer to PROCEDURE - Step 189 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 189 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 190 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 189 [10/2023 - ]
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 190 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 190 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 191 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 190 [10/2023 - ]
- INSTALL RADIATOR COVER PLATE
Refer to PROCEDURE - Step 191 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 191 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 192 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 191 [10/2023 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 192 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 192 [09/2018 - 10/2020] , or refer to PROCEDURE - Step 193 [10/2020 - 10/2023] , or refer to PROCEDURE - Step 192 [10/2023 - ]