Installation [12/2021 - ]: Procedure
- INSTALL SPARK PLUG
Refer to PROCEDURE - Step 1 - INSTALL IGNITION COIL ASSEMBLY
- INSTALL BRACKET
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- CONNECT PURGE VSV (DUTY VACUUM SWITCHING VALVE)
- CONNECT NO. 1 VENTILATION PRESSURE SENSOR HOSE
- CONNECT NO. 4 WATER BY-PASS PIPE
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- CONNECT ENGINE WIRE
Torque: 10 N.m (102 kgf/cm, 7 ft.lbf)
- INSTALL V-BANK COVER SUB-ASSEMBLY
- PERFORM INITIALIZATION
- Perform "Inspection After Repair" after replacing an ignition coil assembly or spark plug.
- w/ Canister Pump Module:
Refer to INITIALIZATION [12/2021 - ]
- w/o Canister Pump Module:
Refer to INITIALIZATION [12/2021 - ]
- w/ Canister Pump Module:
- Perform "Inspection After Repair" after replacing an ignition coil assembly or spark plug.