On-Vehicle Inspection [11/2021 - ]: Procedure
- INSPECT CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY
- Check Rotation Direction Signal:
- According to the display on the GTS, read the Data List.
Powertrain > Engine > Data List
Tester Display VVT-iE Motor Direction Bank 1 Specified Condition
GTS Display Condition Specified Condition VVT-iE Motor Direction Bank1 Ignition switch off → Ignition switch ON Backward If the result is not as specified, inspect the cam timing control motor with EDU assembly and wire harness.
- According to the display on the GTS, read the Data List.
- Check VVT Change Angle:
- Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher.
- Enter the following menus: Powertrain / Engine / Active Test / Control the VVT-iE Opening Angle Bank 1 / Data List / Intake VVT Change Angle Bank 1 and Intake VVT Target Angle Bank 1.
Powertrain > Engine > Active Test
Active Test Display Control the VVT-iE Opening Angle Bank 1 Data List Display Intake VVT Change Angle Bank 1 Intake VVT Target Angle Bank 1 - Read the Data List while performing the Active Test with the engine idling.
Specified Condition
Active Test Movement Order Difference between "Intake VVT Change Angle Bank 1" and "Intake VVT Target Angle Bank 1" 0 deg → 10 deg → 20 deg → 40 deg → 0 deg → 10 deg → END Within 4 DegFR If the result is not as specified, inspect the cam timing control motor with EDU assembly and camshaft timing gear assembly.
- Check Rotation Direction Signal: