LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2003 >> Sentra SE-R, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1120 (Power Window System) >> Power Window System >> CONSULT-II Inspection Procedure >> Active Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Active Test

WARNING: This page is about a different car, the 2004 Nissan Murano. However, it is still accessible from the selected car via links, so may be relevant.
ACTIVE TEST CHART

Test Item Description
RETAINED PWR This test is able to supply RAP signal (power) from BCM (body control module) to power window system and power sunroof system (if equipped). Those systems can be operated when turning on "RETAINED PWR" on CONSULT-II screen even if the ignition switch is turned OFF.
NOTE: During this test, CONSULT-II can be operated with ignition switch in "OFF" position, "RETAINED PWR" should be turned "ON" or "OFF" on CONSULT-II screen when ignition switch is ON. Then turn ignition switch OFF to check retained power operation. CONSULT-II might be stuck if "RETAINED PWR" is turned to "ON" or "OFF" on CONSULT-II screen when ignition switch is OFF.
POWER WINDOW DOWN This test able to transmitted of power window down signal from BCM to power window main switch and front power window switch (passenger side).