LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2005 >> Altima SE-R, Automatic >> Repair and Diagnosis >> Engine Performance >> Engine Control System - VQ35DE >> DTC P1706: PNP Switch >> Overall Function Check >> With GST
April 5, 2026: LEMON Manuals is launched! Read the announcement.

With GST

  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    ECM TERMINAL 102 (PNP SWITCH SIGNAL) AND GROUND VOLTAGE

    Condition (Shift lever) Voltage (Known good data)
    P or N position (A/T) Neutral position (M/T) Approx. 0V
    pt the above position BATTERY VOLTAGE (11 -14V)
  3. G, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G02527303Courtesy of NISSAN MOTOR CO., U.S.A.