LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2006 >> Altima SE-R, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 609 (Engine Control System - Component Testing) >> ASCD Brake Switch >> Component Inspection >> ASCD Brake Switch
April 5, 2026: LEMON Manuals is launched! Read the announcement.

ASCD Brake Switch

WARNING: This page is about a different car, the 2006 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Turn ignition switch OFF.
  2. Disconnect ASCD brake switch harness connector.
  3. Check harness continuity between ASCD brake switch terminals 1 and 2 under the following conditions.
    Fig 1: Checking Harness Continuity Between ASCD Brake Switch Terminals 1 And 2
    G04101963Courtesy of NISSAN MOTOR CO., U.S.A.
    CONDITION REFERENCE CHART

    Condition Continuity
    Brake pedal: Fully released. Should exist.
    Brake pedal: Slightly depressed. Should not exist.

    If NG, adjust ASCD brake switch installation, refer to "BRAKE PEDAL ", and perform step  3 again.