LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Nissan-Datsun
>>
2007
>>
Quest SL
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System - Introduction
>>
Basic Service Procedure
>>
Idle Speed and Ignition Timing Check
>>
Ignition Timing
>>
Method B
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Method B
Remove No. 1 ignition coil.
Fig 1: Attaching Timing Light To Ignition Coil Wires
Courtesy of NISSAN NORTH AMERICA, INC.
Connect No. 1 ignition coil and spark plug with suitable high-tension wire as shown, and attach timing light clamp to this wire.
Fig 2: Identifying Ignition Coil And Spark Plug With Suitable High-Tension Wire
Courtesy of NISSAN NORTH AMERICA, INC.
Fig 3: Identifying Exhaust Pipe Dimension
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
Fig 4: Checking Ignition Timing
Courtesy of NISSAN NORTH AMERICA, INC.