Overall Function Check
Use this procedure to check the overall function of the park/neutral position (PNP) switch circuit. During this check, a 1st trip DTC might not be confirmed.
WITH GST
- Turn ignition switch ON.
- Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.ECM TERMINAL VOLTAGE SPECIFICATION
Condition (Gear position) Voltage V (Known-good data) P and N position Approx. 0 Except the above position BATTERY VOLTAGE (11 - 14V) - If NG, go to "DIAGNOSTIC PROCEDURE ."