LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2011 >> Sentra SE-R >> Repair and Diagnosis >> Body & Frame >> Windows >> Glass, Window System & Mirrors >> Service Information >> Power Window System >> Front Power Window LH Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Front Power Window LH Circuit Inspection

  1. CHECK MAIN POWER WINDOW AND DOOR LOCK/UNLOCK SWITCH OUTPUT SIGNAL
    1. Turn ignition switch ON.
    2. Check voltage between main power window and door lock/unlock switch connector and ground.
      VOLTAGE SPECIFICATIONS

      Connector Terminals Condition Voltage (V) (Approx.)
      (+) (-)
      D5 16 Ground UP Battery voltage
      DOWN 0
      12 UP 0
      DOWN Battery voltage
      Fig 1: Checking Voltage Between Main Power Window And Door Lock/Unlock Switch Connector And Ground
      G05922833Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG 

      OK: GO TO 2.

      NG: Replace main power window and door lock/unlock switch. Refer to "REMOVAL AND INSTALLATION ".

  2. CHECK POWER WINDOW MOTOR CIRCUIT
    1. Turn ignition switch OFF.
    2. Disconnect main power window and door lock/unlock switch and front power window motor LH.
    3. Check continuity between main power window and door lock/unlock switch connector D5 (A) terminals 6, 7 and front power window motor LH connector D8 (B) terminals 1, 3.

      16 - 3 : Continuity should exist. 

      12 - 1 : Continuity should exist. 

    4. Check continuity between main power window and door lock/unlock switch connector (A) terminals 6, 7 and ground.

      16 - Ground : Continuity should not exist. 

      12 - Ground : Continuity should not exist. 

      Fig 2: Checking Continuity Between Main Power Window And Door Lock/Unlock Switch Connector Terminals And Ground
      G05922834Courtesy of NISSAN MOTOR CO., U.S.A.

      OK or NG 

      OK: Replace front power window motor LH. Refer to "REMOVAL AND INSTALLATION ".

      NG: Repair or replace harness.