LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2012 >> Maxima S >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Component Testing >> Ignition Signal >> Component Function Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component Function Check

Regarding Wiring Diagram information, refer to "WIRING DIAGRAM-ENGINE CONTROL SYSTEM- ".

  1. INSPECTION START

    Turn ignition switch OFF, and restart engine.

    Does the engine start? 

    YES-1: With CONSULT: GO TO 2.

    YES-2: Without CONSULT: GO TO  3.

    NO: Go to "DIAGNOSIS PROCEDURE ".

  2. CHECK IGNITION SIGNAL FUNCTION

    With CONSULT 

    1. Perform "POWER BALANCE" in "ACTIVE TEST" mode with CONSULT.
    2. Check that each circuit produces a momentary engine speed drop.

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Go to "DIAGNOSIS PROCEDURE ".

  3. CHECK IGNITION SIGNAL FUNCTION

    Without CONSULT 

    1. Let engine idle.
    2. Read the voltage signal between ECM harness connectors.
      ECM Voltage signal
      + -
      Connector Terminal Connector Terminal
      F14 9 E10 112
      G08146031Courtesy of NISSAN NORTH AMERICA, INC.
      10
      11
      18
      19
      21
      Fig 1: Checking Voltage Signal Between ECM Harness Connector F14 And E10
      G08146032Courtesy of NISSAN NORTH AMERICA, INC.
      NOTE: The pulse cycle changes depending on RPM at idle.

      Is the inspection result normal? 

      YES: INSPECTION END

      NO: Go to "DIAGNOSIS PROCEDURE ".