Overall Function Check
Use this procedure to check the overall function of the park/neutral position (PNP) signal circuit. During this check, a 1st trip DTC might not be confirmed.
WITH GST
- Turn ignition switch ON.
- Check voltage between ECM terminal 102 (PNP signal) and ground under the following conditions.
Condition (Selector lever) Voltage (Known-good data) P or N position (CVT)
Neutral position (M/T)Approx. 0 V Except above BATTERY VOLTAGE (11 - 14 V) - If NG, go to "DIAGNOSIS PROCEDURE ".