Component Inspection
- CHECK PARK/NEUTRAL POSITION SWITCH-1
- Turn ignition switch ON.
- Check the voltage between ECM harness connector and ground.
ECM Condition Voltage + - connector Terminal connector Terminal F24 15 E16 162 Selector lever P or N 12 V Other than above 0 V
Is the inspection result normal?
>>
INSPECTION END
>>
GO TO 2.
- CHECK PARK/NEUTRAL POSITION SWITCH-2
- Remove park/neutral position switch.
- Check park/neutral position switch.
Is the inspection result normal?
>>
INSPECTION END
>>
Replace park/neutral position switch.