LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2009 >> Matrix AWD L4-2.4L (2AZ-FE) >> Repair and Diagnosis >> Starting and Charging >> Charging System >> Alternator >> Service and Repair >> Removal and Replacement >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation








2AZ-FE BATTERY / CHARGING: GENERATOR: INSTALLATION

INSTALLATION

1. INSTALL GENERATOR ASSEMBLY





(a) Install the wire harness clamp bracket with the bolt.
Torque: 8.4 Nm (86 kgf-cm, 74 in-lbf)





(b) Install the generator assembly with the 2 bolts.
Bolt A - Torque: 21 Nm (215 kgf-cm, 16 ft-lbf)
Bolt B - Torque: 52 Nm (530 kgf-cm, 38 ft-lbf)





(c) Install the generator connector and 2 wire harness clamps.
(d) Install the wire harness to terminal B with the nut and install the terminal cap.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
2. INSTALL V-RIBBED BELT Installation
3. INSTALL ENGINE UNDER COVER RH
4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL