LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Acura >> 2009 >> CSX Base, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 14 (Intake Manifold And Exhaust System) >> Injector Base Removal and Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Injector Base Removal and Installation: Installation

WARNING: This page is about a different car, the 2011 Acura TL, 2010 Acura TL, and 2009 Acura TL. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the front injector base (A) and the rear injector base (B) with new gaskets (C), and tighten the injector base mounting bolts/nuts (D) in a crisscross pattern in three steps, beginning with the inner nuts
    NOTE: The front injector base gasket is different from the rear one Do not mix injector base gasket types
    Fig 1: Front Injector Base And Rear Injector Base With Torque Specification
    G05987129Courtesy of AMERICAN HONDA MOTOR CO., INC.
  2. Connect the knock sensor connector (A), then install the harness holder mounting bolts (B)
    Fig 2: Lnock Sensor Connector And Harness Holder Mounting Bolts With Torque Specification
    G05987130Courtesy of AMERICAN HONDA MOTOR CO., INC.
  3. Install the injectors (see INJECTOR REPLACEMENT )
  4. Install the intake manifold (see INSTALLATION )
  5. Inspect for fuel leaks Turn the ignition switch to ON (II), or press the engine start/stop button to select the ON mode (do not operate the starter) so the fuel pump runs for about 2 seconds and pressurizes the fuel line Repeat this operation three times, then check for fuel leakage at any point in the fuel line