Confirmation Procedure
1. Start the engine.
2. Hold the engine speed at 3, 000 rpm without load (in P or N) until the radiator fan comes on, then let it idle for 2 minutes.
3. Do the HDS [Electric Waste Gate].
1. Start the engine.
2. Hold the engine speed at 3, 000 rpm without load (in P or N) until the radiator fan comes on, then let it idle for 2 minutes.
3. Do the HDS [Electric Waste Gate].