ATP-P, ATP-R, ATP-N, ATP-D, ATP-S, ATP-FWD, ATP-RVS, PG1 Open Wire Inspection
NOTICE:
Before disconnecting the TCM connector, jump the SCS line with the HDS, and wait more than 1 minute.
Test Procedure
- Preparation
-
- -
TCM connector (50P): disconnected
- -
Transmission range switch connector (10P): disconnected
- -
- Procedure
-
- -
Perform the inspection according to the following table.
- -
(Disconnected) TCM connector (50P) female terminals
(Disconnected) Transmission range switch connector (10P) female terminals
IG Mode
Normal Conditions
ATP-P open wire inspection
OFF
There is less than 1 Ω
ATP-R open wire inspection
OFF
There is less than 1 Ω
ATP-N open wire inspection
OFF
There is less than 1 Ω
ATP-D open wire inspection
OFF
There is less than 1 Ω
ATP-S open wire inspection
OFF
There is less than 1 Ω
ATP-FWD open wire inspection
OFF
There is less than 1 Ω
ATP-RVS open wire inspection
OFF
There is less than 1 Ω
PG1 open wire inspection
OFF
There is less than 1 Ω
Results
- If abnormal, there is a problem in the circuit.