LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Buick >> 1992 >> Roadmaster Base >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Overhaul & Testing - 700-R4/4L60 >> On-Vehicle Service >> Valve Body >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Valve Body: Installation

  1. Coat check balls with petroleum jelly. Install check balls in proper locations on separator plate. See Figure . Install manual valve link. Ensure manual valve link is properly seated in manual valve. See Figure . Improper positioning may prevent vehicle operation in "D" range.
    NOTE: Improper positioning of throttle valve link will result in erratic shift points or high main line oil pressure.
  2. Install throttle link. Ensure link is properly positioned with lower hook facing outside of transmission case. See Figure . Install valve body and retaining bolts. Tighten bolts to specification. To complete installation, reverse removal procedure.
  3. Lubricate oil filter "O" ring with ATF before installation. Tighten all bolts to specification. See TORQUE SPECIFICATIONS  . Fill transmission with fluid.