LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Buick >> 2012 >> Regal Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 337 (Hybrid/EV Energy Storage System) >> Repair Instructions >> Battery Energy Control Module Replacement >> Installation Procedure
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Installation Procedure

WARNING: This page is about a different car, the 2013 Buick Regal. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: Battery Energy Control Module Fasteners
    GM2596562Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

  1. Install the battery energy control module (2) to the mounting studs and tighten the fasteners (1) to 9 N.m (80 lb in).
  2. Fig 2: Connectors
    GM2596563Courtesy of GENERAL MOTORS COMPANY
  3. Install the connectors (1) and connector (2).
  4. Fig 3: BECM Connector Sequence
    GM2596566Courtesy of GENERAL MOTORS COMPANY
  5. Connect the remaining connectors, in the above sequence, to the battery energy control module.
  6. Enable the hybrid battery. Refer to High Voltage Enabling .
  7. Program the battery energy control module. Refer to Battery Energy Control Module Programming and Setup .