July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Circuit/System Verification

  1. Ignition OFF, measure and record the battery voltage at the C1 12V battery terminals. The battery voltage should stabilize between 12.4 and 12.8 V within a few minutes of turning the ignition OFF.
  2. Start and idle the engine, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be at least 1 V greater than the voltage measured in step 1 but less than 15 V.
    • If not within the specified range, refer to Circuit/System Testing.