Note On Intermittents
Manipulate ISC wiring while observing PCM input PI72 and while observing ISC operation during PCM output cycle PO07. Manipulate TP sensor wiring and connector while observing PCM data PD01 (TP sensor). Ensure TP sensor screws are tight. Cycle TP sensor through its full travel while observing PD01 for erratic operation. Check for correct TP sensor part number and ensure connectors are latched.