Component Testing
Static Test
- Ignition OFF, disconnect the harness connector at the SCB solenoid.
- Test for 30-55 ohms of resistance between the control terminal and the voltage supply terminal of the SCB solenoid.
- If the resistance is not within the specified range, replace the SCB solenoid.
Dynamic Test
- Install a 3A fused jumper wire between the ignition supply circuit terminal and 12 volts. Install a jumper wire between the control terminal and ground.
- Toggle the jumper wire between the control terminal and ground.
- Feel and listen for the operation of the SCB solenoid.
- If the function does not perform as specified, replace the SCB solenoid.