LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Cadillac >> 2007 >> Escalade EXT >> Repair and Diagnosis >> External Pages >> Different car >> Section 682 (Battery, Charging System And Starting System - Introduction) >> Repair Instructions >> Generator Battery Control Module Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2006 GMC Sierra, 2006 GMC Cab & Chassis Sierra, 2006 Chevrolet Silverado, and 2006 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
    IMPORTANT: Prior to installation, ensure that the orientation of the generator battery control module (once completely installed on the negative battery cable) will be such that the module's connector will be closest to the battery's negative terminal as shown in the above graphic. The orientation of the module on the negative battery cable is critical to the proper functionality of the module once installed in the vehicle.
  1. Slide the NEW generator battery control module up onto the negative battery cable.
  2. Using NEW tie straps and electrical tape, attach the generator battery control module to the negative battery cable.
    Fig 1: Connecting Engine Harness Electrical Connector To Generator Battery Control Module
    GM1484797Courtesy of GENERAL MOTORS CORP.
  3. Install the negative battery cable. Refer to Battery Negative Cable Replacement (4.3L Engine) .
  4. Connect the engine harness electrical connector to the generator battery control module.
  5. Program the generator battery control module. Refer to Control Module References .