Circuit/System Verification (ECM)
WARNING: This page is about a different car, the 2009 GMC Sierra, 2009 Chevrolet Silverado, and 2009 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Engine running, accessories OFF, measure and record the battery voltage at the 12V battery terminals. The voltage should be between 12.6 and 15.0 volts.
- If not within the specified range, refer to Charging System Test .
- Observe the scan tool ECM Ignition 1 Signal parameter. The reading should be between 12.6 and 15.0 volts.