Circuit/System Testing
WARNING: This page is about a different car, the 2007 GMC Sierra and 2007 Chevrolet Silverado. However, it is still accessible from the selected car via links, so may be relevant.
- Measure the voltage at the battery terminals and compare it with the Ignition 1 Signal parameter in the ECM data list. Verify that battery and Ignition 1 signal readings do not differ more than 1 volt.
- If greater than 1 volt test the Ignition 1, ground circuits of the ECM for open/high resistance or replace the ECM.
- Go to Charging System Test .