Circuit/System Testing
Open/Close Switch Circuit Test
- Ignition OFF and all vehicle systems OFF, disconnect the harness connector at the S45B liftgate control switch-interior. It may take up to 2 minutes for all vehicle systems to power down.
- Test for less than 10 Ω between the ground circuit terminal 1 and ground.
- If 10 Ω or greater
- Ignition OFF.
- Test for less than 2 Ω in the ground circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, repair the open/high resistance in the ground connection.
- If less than 10 Ω
- Ignition ON.
- Verify the scan tool Liftgate Front Control Switch parameter is Inactive.
- If not Inactive
- Ignition OFF, disconnect the harness connector at the K39 liftgate control module.
- Test for infinite resistance between the signal circuit terminal 4 and ground.
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance, replace the K39 liftgate control module.
- If Inactive
- Install a 3 A fused jumper wire between the signal circuit terminal 4 and the ground circuit terminal 1.
- Verify the scan tool Liftgate Front Control Switch parameter is Active.
- If not Active
- Ignition OFF, disconnect the harness connector at the K39 liftgate control module, ignition ON.
- Test for less than 1 V between the signal circuit and ground.
- If 1 V or greater, repair the short to voltage on the circuit.
- If less than 1 V
- Test for less than 2 Ω in the signal circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, replace the K39 liftgate control module.
- If Active
- Test or replace the S45B liftgate control switch-interior.
OFF/ 3/4 position/MAX Switch Circuit Test
- Ignition OFF and all vehicle systems OFF, disconnect the harness connector at the S45B liftgate control switch-interior, ignition ON.
- Verify the scan tool Liftgate Mode Switch parameter is greater than 300 counts.
- If 300 counts or less
- Ignition OFF, disconnect the harness connector at the K39 liftgate control module.
- Test for infinite resistance between the signal circuit terminal 3 and ground
- If less than infinite resistance, repair the short to ground on the circuit.
- If infinite resistance, replace the K39 liftgate control module
- If greater than 300 counts
- Install a 3 A fused jumper wire between the signal circuit terminal 3 and the ground circuit terminal 1.
- Verify the scan tool Liftgate Mode Switch parameter is less than 5 counts.
- If 5 counts or greater
- Ignition OFF, disconnect the harness connector at the K39 liftgate control module.
- Test for less than 2 Ω in the signal circuit end to end.
- If 2 Ω or greater, repair the open/high resistance in the circuit.
- If less than 2 Ω, replace the K39 liftgate control module
- If less than 5 counts
- Test or replace the S45B liftgate control switch-interior.