Installation Procedure
Hybrid Powertrain Control Module 2 (2) - Install
- Hybrid Powertrain Control Module 2 Mounting Nut (1) - Install and tighten [4x] 9 N.m (80 lb in)
Electrical Connector (1) - Connect [2x]
- Enable the high voltage system. High Voltage Enabling
- Drive Motor Battery Cover - Install - Drive Motor Battery Cover Replacement (With HP9)
- Reprogram the hybrid powertrain control module 2, refer to Control Module References
CAUTION:
Refer to Fastener Caution