LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 1982 >> RV Cutaway Standard Trans >> Labor Times >> Other Variant >> Engine Mechanical >> Lubrication Systems >> Oil Pump >> Remove, Install, and Overhaul
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Oil Pump: Remove, Install, and Overhaul

WARNING: This page is about the RV Cutaway Automatic Trans, Trans Mfr CD 400/M40, which is a different variant/trim than selected.
Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,Gas,Automatic Trans2.1B
Additional Procedure: OIL PUMP: Remove, Install, and Overhaul:
w/Cruise Control add0.2B
w/Engine Oil Cooler add0.4B
Where Air Cond interferes add0.1B
Where Elect Eng System interferes add0.5B
Where Pwr Strg interferes add0.3B