October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Instrument Panel Cluster (IPC) - Programming and Setup
INSTRUMENT PANEL CLUSTER PROGRAMMING AND SETUP
The instrument panel cluster (IPC) must be setup using the service programming system (SPS). Refer to Service Programming System (SPS).