Installation Procedure
- Install the generator.
Tighten:
- Tighten the bolts to 50 N.m (37 lb ft).
- Tighten the nuts to 30 N.m (22 lb ft).
- Connect the generator battery positive terminal (1).
- Connect the regulator electrical connector (2).
- Install the drive belt. Refer to DRIVE BELT REPLACEMENT in Engine Mechanical - 3.5L.
- Position the engine into the normal location and install the engine mount strut bolts. Refer to ENGINE MOUNT STRUT REPLACEMENT - LEFT and ENGINE MOUNT STRUT REPLACEMENT - RIGHT in Engine Mechanical - 3.5L.
- Connect the windshield wiper transmission. Refer to WIPER MOTOR MODULE REPLACEMENT in Wiper/Washer Systems.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure .
NOTE:
Refer to FASTENER NOTICE
in Cautions and Notices.