Installation Procedure
- Install the BPMV bracket.
- Install the 2 upper BPMV bracket bolts (1).
- Tighten the BPMV bracket bolts.
Tighten: Tighten the bolts to 25 N.m (18 lb ft).
- Install the BPMV to the bracket by pressing the BPMV mounting pins into the bracket insulators until fully seated.
- Install the BPMV bolt (1).
Tighten: Tighten the bolt to 11 N.m (97 lb in).
- Install the brake pipes to the retainer on the wheelhouse panel.
- Install the cover to the ECM and the TCM.
NOTE:
Refer to Fastener Notice
.