Component Testing
- Test for 20-24 Ω between the terminals of the EVAP vent solenoid valve.
- If not within the specified range, replace the EVAP vent solenoid valve.
- Measure the resistance between each terminal of the EVAP vent solenoid valve and the EVAP vent solenoid valve housing. The DMM should display OL.
- If less than the specified value, replace the EVAP vent solenoid valve.