LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Chrysler
>>
1996
>>
Sebring L4-2.0L DOHC
>>
Repair and Diagnosis
>>
Windows and Glass
>>
Windows
>>
Power Window Switch
>>
Testing and Inspection
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Power Window Switch: Testing and Inspection
POWER WINDOW SWITCH
CONTINUITY CHECK
Main switch
Sub switch
Inspect
power window switch
for proper continuity according to the charts and replace the switch if it does not operate properly.