LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2002 >> PT Cruiser Base, Standard >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System >> Battery Hold Down >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Battery Hold Down: Installation

  1. Install the battery hold down in the vehicle.
  2. Install the battery hold down retaining bolt(s).
  3. On gasoline engine equipped vehicles, install the air cleaner housing (Refer to 2.4L DOHC ).
  4. On diesel engine equipped vehicles, install the passenger front seat.
  5. Connect the negative battery cable.