Integrated Control Unit - MK25E: Installation
- Install unit (1), pushing mounting bracket down into mounting grommets (2) located in body side rail.
CAUTION: Before installing the ABM harness connector (2) on the ABM (1), be sure the seal is properly installed in the connector.
- Insert ABM harness connector (2) into socket of ABM (1) and close cover, locking connector in place.
- Install left (2) and right (1) rear brake tubes at hydraulic control unit (4). Tighten tube nuts to 20 N.m (177 in. lbs.) torque.
- Install left (2) and right (3) brake tubes at hydraulic control unit (4). Tighten tube nuts to 20 N.m (177 in. lbs.) torque.
- Install primary (4) and secondary (1) brake tubes at hydraulic control unit (7). Tighten tube nuts to 20 N.m (177 in. lbs.) torque.
- Remove brake pedal holding tool.
- Connect battery negative cable (2) to battery post. It is important that this is performed properly. (Refer to ELECTRICAL/BATTERY SYSTEM - STANDARD PROCEDURE)
- Fill and bleed (1) base brake hydraulic system and ABS. See STANDARD PROCEDURE and (Refer to BRAKES - STANDARD PROCEDURE) .
- Perform Diagnostic Verification Test and clear any faults. (Refer to BRAKES - DIAGNOSIS AND TESTING)