LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> External Pages >> Different car >> Section 106 (Interior/Exterior) >> Convertible Top >> Header Assembly >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Header Assembly: Installation

WARNING: This page is about a different car, the 2006 Dodge Viper. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Make sure the mounting bushings are installed in the header assembly before installing the bolts.
  1. Install the header assembly and install the bolts.
  2. Tighten the rear rail bolts to 18 N.m (13 ft. lbs.).
  3. Tighten the balance link shoulder bolts to 20 N.m (15 ft. lbs.).
  4. Position the stay pad straps onto the header assembly and install new rivets.
  5. Position the cover assembly onto the back of the header and install new rivets.
  6. Install the both tension cables. (Refer to BODY/CONVERTIBLE TOP/TENSION CABLE - INSTALLATION)