LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Chrysler
>>
2007
>>
Aspen 2WD V8-4.7L Flex Fuel
>>
Repair and Diagnosis
>>
Power and Ground Distribution
>>
Relay Box
>>
Service and Repair
>>
Installation
July 1:
So it begins
. Don't worry, this is not in the correct legal jurisdiction!
Installation
INSTALLATION
1.
Connect electrical harness connectors to Power Distribution Center (PDC).
2.
Position PDC and engage into the retaining tabs.
3.
Connect the battery negative cable.