LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2007 >> Aspen 2WD V8-5.7L >> Repair and Diagnosis >> Power and Ground Distribution >> Fuse Block >> Service and Repair >> Junction Block >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation






INSTALLATION




1. Connect wire harness connectors to the Junction Block (JB) (1).

2. Position JB and install mounting fasteners (3).

3. Install cowl trim cover.

4. Connect the battery negative cable.