LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, EDG >> Repair and Diagnosis >> Engine Mechanical >> Starter >> Starting System (Service Information) >> Diagnosis and Testing >> Control Circuit Test >> Ignition Switch
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Ignition Switch

After testing starter solenoid and relay, test ignition switch and wiring. Refer to SWITCH, IGNITION or appropriate SYSTEM WIRING DIAGRAMS article for more information. Check all wiring for opens or shorts, and all connectors for being loose or corroded.