Removal And Installation - Emergency Assistance Module: Installation
WARNING: This page is about a different variant/trim than selected.
- Position the EAM to the EAM mounting bracket.
- Install and tighten the four screws for the EAM. Tighten the screws securely.
- Connect the instrument panel wiring harness connectors.
- Install the switch bank pod. Refer to POD, SWITCH BANK, REMOVAL AND INSTALLATION .
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.