Electronic Fuel Control System Tests: Notes
NOTE:
The SPARK CONTROL COMPUTER SPARK TEST should be made prior to beginning any test on EFC system. The following tests should be performed in the sequence given. Ensure basic timing and hot curb idle speed are set to specifications before testing.