LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 1991 >> Stealth Base, Automatic >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - System/Component Tests >> Idle Control System >> Idle Speed Control (ISC) Motor Operation Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Idle Speed Control (ISC) Motor Operation Test

CAUTION: DO NOT  apply more than 6 volts to ISC motor.
  1. Remove throttle body from intake plenum. Remove ISC motor from throttle body. Apply 6-volt source parallel to terminals No. 2 and 5 of ISC motor connector. See Fig 1 .
    Fig 1: ISC Motor Connector Term. ID
    G91D11836Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
  2. Apply source ground lead to ISC motor connector terminals No. 3 and 6. Note slight movement of ISC motor plunger. Remove ground leads from terminals No. 3 and 6.
  3. Apply and remove source ground at terminals No. 1 and 6, 1 and 4, 3 and 4, and 3 and 6. Note slight movement of ISC motor plunger during each phase of test.
  4. Beginning at terminal No. 6, reverse grounding sequence following same procedure specified in step 2). If motor does not operate when grounding any of specified terminals, replace ISC motor.