LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2003 >> Durango Base, 5.9 Z, 4WD, Part Time >> Repair and Diagnosis >> External Pages >> Different car >> Section 41 (Electronic Control Modules) >> Transmission Control Module >> Operation >> Shift Schedules
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Shift Schedules

WARNING: This page is about a different car, the 2004 Dodge Dakota and 2003 Dodge Dakota. However, it is still accessible from the selected car via links, so may be relevant.

As mentioned earlier, the TCM has programming that allows it to select a variety of shift schedules. Shift schedule selection is dependent on the following:

As driving conditions change, the TCM appropriately adjusts the shift schedule. Refer to the following chart to determine the appropriate operation expected, depending on driving conditions.

Fig 1: Shift Schedules Chart
G02656605Courtesy of DAIMLERCHRYSLER CORP.