LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2007 >> Caravan V6-3.3L VIN R >> Repair and Diagnosis >> Relays and Modules >> Relays and Modules - Body and Frame >> Power Trunk / Liftgate Control Module >> Service and Repair >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Installation






INSTALLATION

1. Install the Power Liftgate (PLG) control module on the D-pillar and install retaining screw.

2. Connect the wire harness connections to the PLG control module. Be certain to slide connector locks to the locked position.

3. Install the D-pillar trim panel on the vehicle.

4. Connect the battery negative cable.

5. Using an appropriate scan tool, check and erase any PLG control module diagnostic trouble codes.

6. Verify PLG system operation. Cycle the PLG through one complete open and close cycle, this will allow the PLG control module to relearn its cycle with the new components.